What We Do

Abletech Services

Excellence in underground asset protection since 1982

Abletech Underground Group create personalised services for civil construction, mining and infrastructure companies. With almost 40 years of experience, we also offer project management services for private home owners. Abletech Underground Group are experts in vacuum excavation, underground service location, water truck and water cart services covering the Sunshine Coast, Gold Coast, North Brisbane, Roma, Chinchilla and Southeast Queensland areas.
Underground Services Location

Our projects

With 40 years experience in construction and mining, Abletech Underground Group are experts in the industry. We strive to set the standard of excellence across all facets of underground service location, vacuum excavation and water truck and water cart solutions.

Renewable & Clean Energy

Solar, Wind, Battery, Pumped Hydro, Hydrogen.
Project Scope

A large-scale renewable energy development near Woolooga, delivering clean solar power to support Queensland’s growing electricity network and energy transition.

Location
Woolooga, Queensland
Project Scope

A major renewable energy development near Dulacca, approximately 250 km west of Toowoomba, involving the construction of 43 wind turbines, access roads, electrical reticulation, and a substation.

Location
Dulacca, Western Downs Region, Queensland
Project Scope

Bulli Creek Clean Energy Park (Energy Park); a large-scale, multi-stage renewable energy project. The Energy Park covers 5,000 hectares and is located 125 kilometres southwest of Toowoomba, Queensland.

Location
South-West of Millmerran, Queensland
Project Scope

A major 205MW / 410MWh battery energy storage facility in Brendale, delivering large-scale energy storage to strengthen grid reliability and support renewable integration across Southeast Queensland.

Location
Brendle, Brisbane, Queensland
Project Scope

The Borumba Pumped Hydro Project, near Imbil southwest of Gympie, involves the development of pumped hydro energy storage at Lake Borumba. The Borumba Pumped Hydro Project will be capable of producing 2,000 MW and storing up to 24hours of energy.

Location
Imbil, Queensland

Oil & Gas

Oil, Gas, LNG, Pipelines, Processing Facilities.
Project Scope

Integrated Gas Construction Projects –A series of oil and gas infrastructure developments delivered by Downer Group across the Maranoa Region, involving gas processing facilities, pipelines, compression stations, and extensive electrical and instrumentation (E&I) works.

Location
Maranoa Region, Queensland
Project Scope

Santos’ CCS Project is expected to capture CO2 that has separated from natural gas at the Moomba Gas Plant in South Australia. The Moomba CCS Project is expected to store 1.7 million tonnes of CO2 each year. That’s the equivalent of taking 700,000 cars off the road.

Location
Moomba, South Australia
Project Scope

Arrow Energy’s Surat Gas Project North Development – A major coal seam gas development by Arrow Energy in the Surat Basin, delivering large-scale gas production infrastructure to support domestic energy supply and LNG export operations.

Location
Miles, Queensland
Project Scope

A $15 million electricity infrastructure upgrade delivered by Energex, constructing a major high-voltage transmission line between Eudlo and the Maroochydore West Electrical Substation to strengthen power supply across the Sunshine Coast.

Location
Sunshine Coast, Queensland
Project Scope

Provided field support for the Bowen Plug & Abandon Campaign, delivering integrated abandonment services across the Bowen Basin in Queensland.

Location
Moranbah, Bowen Basin, Queensland
Project Scope

Bravus Coal Mine – Nanango – A large-scale open-cut coal mining operation near Nanango, operated by Bravus Mining & Resources, featuring extensive surface pits, heavy haulage infrastructure, and supporting facilities that contribute to regional employment and energy supply.

Location
Nanango, Queensland

Utilities & Water Infrastructure

Water, Sewer, Stormwater, Treatment Plants.
Project Scope

A major water security infrastructure project connecting Dungowan Dam to the Calala Water Treatment Plant, delivering a 55 km pipeline to support long-term water supply for Tamworth and the Peel Valley.

Location
Tamworth, New South Wales
Project Scope

This recycled water scheme will provide year-round water security for many Wamuran farmers while sustainably managing wastewater from the Caboolture South Sewage Treatment Plant (STP). The scheme will deliver about 2.6 gigalitres of recycled water per year, the equivalent of 1051 Olympic swimming pools.

Location
Caboolture, Queensland
Project Scope

A major water and wastewater infrastructure upgrade supporting the growing Aura Community and Harmony Estate developments near Caloundra, including new pipelines, pump stations, reservoirs, and water supply connections from Ewen Maddock Dam.

Location
Sunshine Coast, Queensland
Project Scope

Gympie Stormwater Pipe Rehabilitation Project – A targeted infrastructure repair project in Gympie, where a defective stormwater pipeline was identified and rectified through the installation of SmartLock pipe patches to restore structural integrity and extend asset life.

Location
Gympie, Queensland

Transport & Civil Infrastructure

Roads, Rail, Airports, Ports.
Project Scope

A major transport infrastructure project delivered by Sunshine Coast Council to upgrade key arterial roads and improve traffic flow, active transport, and public access into Mooloolaba.

Location
Mooloolaba, Queensland
Project Scope

A major transport technology upgrade along the Bruce Highway between the Pine River and the Sunshine Motorway on the Sunshine Coast, delivering real-time traffic management systems to improve safety, reduce congestion, and enhance travel reliability.

Location
Sunshine Coast, Queensland
Project Scope

A major road infrastructure project delivered by Ipswich City Council in the Springfield region, expanding key transport corridors from two to four lanes as the largest road upgrade in the council’s history.

Location
Ipswich, Queensland
Project Scope

A $1 billion transport infrastructure project delivering a new 26 km four-lane divided highway between Woondum and Curra, improving safety and connectivity near Gympie.

Location
Gympie, Queensland
Project Scope

A major public transport and road infrastructure upgrade in Brisbane, improving busway connectivity and traffic flow between Sadlier Street and Rode Road to support growing commuter demand.

Location
Brisbane, Queensland
Project Scope

A major rail capacity and reliability upgrade between Beerburrum and Nambour, delivering duplicated tracks and modernised infrastructure to improve passenger and freight services on the Sunshine Coast line.

Location
Sunshine Coast, Queensland
Project Scope

Toowoomba Regional Council Flood Recovery Program – A large-scale disaster recovery and resilience program (DRFA) led by Toowoomba Regional Council to restore and upgrade more than 6,500 km of roads, over 100 culverts and floodways, and associated drainage infrastructure across the Toowoomba region following major flood events in 2020 and 2022, strengthening long-term network resilience.

Project Scope

A 1.6 km transport infrastructure project delivered by Sunshine Coast Council to improve connectivity into Caloundra CBD, reduce congestion, and promote active and sustainable transport, with flow-on benefits for surrounding communities including Currimundi, Dicky Beach, and Moffat Beach.

Location
Sunshine Coast, Queensland
Project Scope

A major road infrastructure upgrade near Tewantin, improving traffic flow, safety, and connectivity around the Noosa region by diverting through-traffic away from the town centre.

Location
Noosa, Queensland

Infrastructure

Project Scope

A $148 million upgrade of the Sunshine Coast Stadium within the Kawana Sports Precinct, expanding permanent seating to over 10,000 and delivering new grandstands to support major sporting and entertainment events.

Location
Sunshine Coast, Queensland